Projects | Building Services | Dubai Mall Diversion of Storm Water Drainage Away from the Burj Lake

Dubai Mall Diversion of Storm Water Drainage Away from the Burj Lake

Client: Emaar Malls Group
The scope of the project was to divert the existing storm water system away from the Burj Lake.
This included Installation of submersible pumps, installation of 4 Kilometer 400mm/ 355mm dia HDPE piping from Rain water tanks to Main break tank, modification of distribution boards and cabling for pumps and BMS system integration